Boulder Canyon Construction Travel Advisory

There will be construction in Boulder Canyon all summer, so for those of you that travel via that route please be aware of the below information and consider alternate routes if appropriate (Lyons or Lefthand Canyon via Ward to Peak to Peak; Coal Creek Canyon through Nederland).

Boulder Canyon will be closed for 4 hour blocks:
10a – 2p
Monday – Thursday
April 15th – August 31, 2019
Please allow 15-30 minutes additional to your travel time to arrive safely and on time for your appointment.
If you arrive early you are welcome to get out and stretch your legs until the patient before you leaves. 

 

Please refer to maps.google.com for current and estimated driving times
as well as determine an alternate route.

Please feel free to reach out with any questions during this tricky scheduling period. Please refer to the online session scheduler to see rates and available appointments and to schedule or call our office (303) 819-8084.

CDOT project details and updated information for CO Hwy 119 / Boulder Canyon:
https://www.codot.gov/projects/co-119-boulder-roadway-improvements/co-119-boulder-roadway-improvements

Please take closure time (M-F, 9-11a & 1-3p) into consideration when scheduling your appointment to allow for the needed travel time to get you to and from Mandala Integrative Veterinary Care.

Use the map below and Google Maps
to determine alternate route & associated driving times. CO 119 detour map CO119 combined maps with side roads CO119 traffic signal stops